2 Fix the cable with cable ties to the cable tie mountings.
7.6.12

To connect the alarm output

1 Connect the alarm output cable to the appropriate terminals as
shown in the illustration below.
a
A4P
X5M
X2M
a
Installation of EKRP1HB is required.
2 Fix the cable with cable ties to the cable tie mountings.
7.6.13
To connect the space heating ON/OFF
output
1 Connect the space heating ON/OFF output cable to the
appropriate terminals as shown in the illustration below.
a
A4P
X5M
X2M
a
Installation of EKRP1HB is required.
2 Fix the cable with cable ties to the cable tie mountings.
EGSQH10S18AA9W
Daikin Altherma ground source heat pump
4P351748-1D – 2016.02
34
35
29
29
7.6.14
To connect the changeover to external
heat source
1 Connect the changeover to external heat source cable to the
appropriate terminals as shown in the illustration below.
a
A4P
X5M
X2M
a
Installation of EKRP1HB is required.
2 Fix the cable with cable ties to the cable tie mountings.
7.6.15
To connect the power consumption digital
inputs
1 Connect the power consumption digital inputs cable to the
appropriate terminals as shown in the illustration below.
a
A8P
X5M
X2M
a
Installation of EKRP1AHTA is required.
2 Fix the cable with cable ties to the cable tie mountings.
7.7
Finishing the indoor unit
installation
7.7.1
To fix the user interface cover to the
indoor unit
1 Make sure that the front panel is removed from the indoor unit.
See
"7.2.2 To open the indoor unit" on
2 Plug the user interface cover into the hinges.
7 Installation
N
L
page 23.