▪ Safety instructions that you must read before installing 6.16.4 Electricity meter ............26 6.16.5 Solar inverter/energy management system ....27 ▪ Format: Paper (in the box of the unit) Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
▪ A subset of the latest technical data is available on the regional DANGER: RISK OF BURNING/SCALDING Daikin website (publicly accessible). ▪ The full set of latest technical data is available on the Daikin CAUTION Business Portal (authentication required). The hydro module is heavy. It requires at least two persons Online tools to carry it.
▪ Prepare in advance the path along which you want to bring the Details of type and rating of fuses, or rating of circuit unit to its final installation position. installation" [ 4 15]. breakers are described in "6 Electrical Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
▪ Remove the hydro module before you carry the unit up or down staircases. See "4.2.2 To remove the hydro module from the unit" [ 4 7]. ▪ It is recommended to use lifting straps to carry the unit up or down staircases. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
(example: open flames, an operating gas appliance or an operating electric heater). WARNING Make sure installation, servicing, maintenance and repair comply with instructions from Daikin and with applicable legislation and are executed ONLY by authorised persons. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C –...
4 6]): 1 User interface panel 2 Front panel 5 Open the installer switch box as follows: 2 Remove the insulation from the shut-off valves by cutting the cable ties. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Page 8
6 Unlink the connectors that run from the hydro module to the main switch box or other locations. Route the wires through the grommets of the upper hydro module cover. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Do NOT tilt the unit forwards: 1° 1° 0° NOTICE To avoid structural damage on unit, ONLY move the unit Water drain valve when levelling feet are at their lowest position. Brine drain valve EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
The following figure is an example and may NOT Deformation of the piping can cause malfunctioning of the completely match your system layout unit. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
5 Remove the safety valve on top of the vessel. freezing. For more information, see setting [A‑04] in temperature" [ 4 35]. "7.4.4 Brine freezing 6 Top up the vessel with brine until it is approximately 2/3 filled. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
A pressure relief valve (field supply) with an opening pressure of maximum 10 bar (=1 MPa) must be installed on the domestic cold water inlet connection in accordance with the applicable legislation. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Fixed grating Trapped gully Metal discharge pipe from safety device to tundish Discharge pipe from tundish, with continuous fall. See Building Regulation G3 section 3.56, Table 03 and worked example. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
The piping in the complete water circuit MUST be insulated to prevent reduction of the heating capacity. Consider that the space heating piping can condensate during cooling operation. Foresee adequate insulation for these pipes. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
For details of C1 and C5, see "6.4 To connect the main power supply" [ 4 16]. Normal operation: backup heater = maximum 3 kW Emergency operation: backup heater = maximum 6 kW EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
C5: Power supply for the rest of the unit current sensors. (1N~) Wires: 3×2. Use part of the cable (40 m) delivered as accessory. [9.9.1]=3 (Power consumption control = Current sensor) [9.9.E] Current sensor offset Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Page 17
Connect the factory-mounted power supply cable to a 1N~ or 3N~ — power supply. Preferential kWh rate power supply with separate normal kWh rate power supply NOT ALLOWED EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Page 18
Connect the preferential kWh rate power supply contact (S1S) as 1× follows. Detail C4: Connection of X11Y Factory-mounted cables. 2× Disconnect X11Y from X11YA, and connect it to X11YB. X2M/5+6 1× X11YB X11Y X11YA 1× Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
1 Connect the external temperature sensor cable to the indoor unit. 1× 1× 3 Fix the cable with cable ties to the cable tie mountings. Factory-mounted cable Splicing connectors (field supply) EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Cable sleeve (field supply) [9.2.3] DHW pump schedule unit" [ 4 6]): 1 Open the following (see "4.2.1 To open the indoor 1 Top panel 2 User interface panel 3 Installer switch box cover Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
3 Fix the cable with cable ties to the cable tie mountings. 6.10 To connect the space cooling/ heating ON/OFF output Wires: (2+1)×0.75 mm² Maximum load: 3.5 A, 250 V AC — unit" [ 4 6]): 1 Open the following (see "4.2.1 To open the indoor EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
4 Main switch box cover appropriate terminals as shown in the illustration below. 2 Connect the changeover to external heat source cable to the appropriate terminals as shown in the illustration below. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
NOTICE Before disconnecting. If you want to remove or disconnect the brine low pressure switch, first set [C‑0B]=0 (brine low pressure switch not installed). If not, this causes an error. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
3 Fix the cable with cable ties to the cable tie mountings. ▪ App control of the heat pump system ▪ Integration of the heat pump system in a Smart Grid application Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Unit control method On the user interface, make sure to set Solar inverter/ 0.75~1.5 mm Depends on 100 m [2.9]=2 (Control = Room thermostat) energy application management system + 230 V AC detection voltage (X1A) EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Power line (field supply) INFORMATION It is recommended to connect the LAN adapter to the router directly. Depending on the wireless bridge or power line adapter model, the system might not function properly. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
3 For the system to run in the "Recommended ON" operation mode (Smart Grid application), connect the digital outputs of the solar inverter/energy management system to LAN adapter digital inputs X1A/1+2 LAN. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
To restart the configuration wizard, Installer settings > Configuration wizard. To access Installer settings, see "7.1.1 To access the most used commands" [ 4 28]. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
If required, you can afterwards backup heater can take over the heat load or not. configure more settings. You can change all these settings via the menu structure. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
The backup heater is adapted to be connected to most common European electricity grids. The type of backup heater can be viewed a Main LWT zone but not changed. Code Description [9.3.1] [E‑03] ▪ 4: 9W Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Control Emitter type Define how the operation of the unit is controlled. For more info about this functionality, see "7.2.5 Configuration zone" [ 4 31]. wizard: Main EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Because it reacts more [5.9] [6-00] Heat pump ON hysteresis quickly, it prevents high rises and drops of the indoor temperature ▪ 2°C~40°C and water temperature at tap points. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Example to equally increase the leaving water temperature for all ambient temperatures. Examples Weather-dependent curve when slope is selected: Weather-dependent curve when offset is selected: EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
To fine-tune the weather-dependent curve: 2-points curve [2.4] Main zone > Setpoint Weather dependent The following table describes how to fine-tune the weather- mode dependent curve of a zone or tank: Additional zone – Heating Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
▪ the heat pump module is connected to preferential kWh ▪ 2: 2 contacts rate power supply where power supply is interrupted and preferential kWh rate power supply is activated. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Ext. amb. sensor offset Averaging time [9.C] Bivalent Bivalent Boiler efficiency Temperature Hysteresis Only applicable in Swedish language. INFORMATION Depending on the selected installer settings and unit type, settings will be visible/invisible. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
The system is properly earthed and the earth terminals Operation and turn off Space heating/cooling and Tank are tightened. operation. The fuses or locally installed protection devices are installed according to this document, and have NOT been bypassed. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Underfloor heating. 1 Set the user permission level to Installer. See "To — level" [ 4 28]. change the user permission 2 Go to [A.4]: Commissioning > UFH screed dryout. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
During the 10 day brine pump operation, the setting will be displayed as ON in the menu. Once the procedure has been completed, it will change to OFF automatically. EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Check for correct operation of the temperature and pressure relief valve. Manually operate the temperature and pressure relief valve to ensure free water flow through discharge pipe. Turn knob left. Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Close the valve. Clean and rinse the water filter. NOTICE Handle the filter with care. To prevent damage to the mesh of the filter, do NOT use excessive force when you reinsert EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
4 6]. 1 Remove the clip that fixes the domestic hot water OUT pipe. 2 Disconnect the pipe such that the tank is accessible for visual inspection (e.g. with an endoscope). Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
11 Technical data Technical data A subset of the latest technical data is available on the regional Daikin website (publicly accessible). The full set of latest technical data is available on the Daikin Business Portal (authentication required). 11.1 Piping diagram: Indoor unit...
Page 45
Only for dual cable power supply Only for dual cable power supply Main LWT zone Main leaving water temperature Only for single cable power Only for single cable power zone supply supply EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Page 46
Without pressure loss detection (11) Ext. outdoor ambient (11) External outdoor ambient thermistor thermistor Switch box (12) LAN adapter connection (12) LAN adapter connection Ethernet Ethernet LAN adapter LAN adapter Switch box Installation manual EGSAH/X06+10UD Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
Page 47
Power limitation demand input 3 FIELD SUPPLY A8P: X801M: 3-5 signal 2 core Power limitation demand input 4 Router for LAN adapter A8P: X801M: 4-5 A15P: X4A signal ethernet 4D121919 EGSAH/X06+10UD Installation manual Daikin Altherma 3 GEO 4P598591-1C – 2023.02...
WARNING TO INSTALLER ■ This installation is subject to building regulation approval, notify Local Authority of intention to install. ■ Use only manufacturer's recommended spare parts. Contact your local Daikin dealer. ■ Installed by name address tel. No.
Page 52
4P598591-1 C 00000009 4P598591-1C 2023.02 Verantwortung für Energie und Umwelt...
Need help?
Do you have a question about the Altherma 3 GEO EGSAH06UD Series and is the answer not in the manual?
Questions and answers