Belkin OmniView PRO2 Rack User Manual page 20

Console with kvm switch
Hide thumbs Also See for OmniView PRO2 Rack:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Installation
Connecting the servers:
3.7
Connect all servers to the Console and secondary KVM switches.
Refer to the "Connecting Servers to the Console" section on page 11
for instructions.
3.8
Make sure that the power cable is connected to the Console and that the
Console is powered on.
3.9
Power up the secondary KVM switches sequentially, beginning with BANK 01,
by connecting each unit's power supply. Each KVM switch should display its
corresponding BANK address number as it is powered up.
Note: If the KVM switches do not enumerate correctly, recycle the power on
the Console to detect newly added secondary KVM switches. If the KVM
switches still do not enumerate correctly, check that all KVM switches
have the correct BANK address assigned to them and that all daisy-chain
cables are connected properly.
3.10
Verify that the Console has detected all secondary KVM switches by
scrolling through the BANKs using the On-Screen Display (OSD)
(refer to the "OSD-Menu Keyboard Commands" section on page 22).
1
2
3
4
5
6
7
8
20

Advertisement

Table of Contents
loading

Table of Contents