Installing the CS800 System in the Rack
6. Fit the PRIMECENTER/DataCenter rack cable management as described in the
technical manual for the corresponding rack.

Preparing the Server

Figure 25: Preparing the server
Place the outer telescopic rails on the sides of the server (see arrow 1 in
the outer telescopic rails forwards to secure them (see arrow 2 in
50
1
Installing the ETERNUS CS800 Components
2
figure
25). Slide
figure
25).