Installing the ETERNUS CS800 Components
Installing the CS800 System in the Rack
V
Rack System Requirements
The rack systems from Fujitsu Technology Solutions (PRIMECENTER Rack or DataCenter
Rack) support the installation of CS800 components. Installation in most current rack
systems from other manufacturers (3rd party racks) is also supported.
To ensure proper ventilation, any unused areas in the rack must be sealed using dummy
covers. Ventilation takes place from the front to the back and may not be obstructed!
The power is supplied via the multiple socket outlets fitted in the rack.
PRIMECENTER/DataCenter Rack
The main features of the rack systems from Fujitsu Technology Solutions are as follows:
Support systems that can be mounted without many tools
●
The support systems have a linear alignment feature to ensure that they can be
adjusted to different rack depths.
Enhanced cable management in the lateral rack area
●
The mounting of the rails in the different racks is described in the next sections.
Installation of the cable management is described in detail in the Technical Manual for the
respective rack.
U41842-J-Z125-1-76
CAUTION!
Please note the safety instructions in section
●
page
21.
At least two people are needed to position the server into/out of the rack.
●
The rack can tip over when more than one unit is removed.
●
The CS800 system may not occupy the top height unit of the rack (38 HU/42 HU
●
PRIMECENTER Rack and/or DataCenter Rack), as otherwise boards or fans
cannot be replaced even with the plug-in module fully extended.
Installing the CS800 System in the Rack
"Environmental Protection" on
43