Timer Measurement - Leica Sprinter 150 User Manual

Electronic level
Hide thumbs Also See for Sprinter 150:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
6.6
BFFB Line Levelling Measurement*
Step Key/Screen
Description
1.
Initialize the BFFB method.
2.
Initiate measurement to Benchmark.
3.
Backsight measurement displayed.
4.
Measurement to foresight.
5.
Foresight measurement displayed.
6.
Measure to the foresight staff (second
sighting).
7.
Foresight (second sighting) measure-
ment displayed.
8.
Measure to the backsight staff (second
sighting).
Operation
Step Key/Screen
Description
9.
Backsight (second sighting) measure-
ment displayed.
10.
System displays current 'Change Point'
measurement report. Press ENTER key
to accept the result.
11.
System refreshes a standby display for
measurement to the backsight of next
change point.
Mean (average) of height difference in double-
sighting of backsight and foresight for BFFB line
levelling method.

6.7 Timer Measurement*

Set measurement time interval 00 hr:00 min in
Menu\Settings\Timer. Press and hold measuring key for 3 seconds
to start timer measurement, Timer icon will be shown at the top left
of LCD display to indicate current measurement mode. To stop
timer measurement, press and hold measuring key for 3 seconds.
14
Sprinter 150/150M/250M - 1.0.0en
EN
DE
FR
ES
IT
PT
NL
NO
SV
dH
FI
DA

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sprinter 150m

Table of Contents