Tiller handle steering friction
Hide thumbs Also See for 40:
Table of Contents

Advertisement

f
b
2
3
c
f
1
2
d
1
a
e
d
1
2
9. Connect:
• Wiring harness coupler 1
• Variable trolling RPM switch coupler 2
• Warning indicator coupler 3
NOTE:
• Route the wiring harness a, variable trolling
RPM switch lead b, and warning indicator
lead c as shown.
• Fasten the wiring harness, with the plastic
ties d and clamp e as shown.
• Fasten the variable trolling RPM switch lead
and warning indicator lead with the clamps
f as shown.
10. Fasten:
• Plastic tie 1
NOTE:
Fasten the battery cable, wiring harness, vari-
able trolling RPM switch lead, and warning
indicator lead to the shift cable and throttle
cable.
11. Install:
• Grommet holder 1
• Bolts 2
NOTE:
After installing the grommet holder 1, lift the
tiller handle straight up and check that the
cables and leads are not pulled.