INSTALLERS INFORMATION - GAS CONNECTION

• Run gas supply
For pipe sizing, refer to your local
gas installation codes. Copper
supply should be run leaving a
flared connection at the position
shown.
• Purge supply of air and debris
All foreign materials such as filings
must be purged from the gas
supply, as they may cause the gas
control valve to malfunction.
• Fit heater into place
When the heater is in place and
properly secured, attach the gas
supply to the supplied barrel union
and tighten.
NOTE: On completion of work a gas
leak test must be carried out.
Use a soapy solution on all gas
connections. Leaks will be visible when
the soapy solution forms bubbles. When
finished, wipe soapy solution with a rag
to remove residue.

INSTALLERS INFORMATION - ELECTRICAL CONNECTION

The heater has a power cord with a three
pin plug supplied. The power cord
passes through the slot in the lower left or
right hand side of the heater front
assembly.
Rinnai recommends that the heater be
plugged into a 240V,10A earthed power
point. The power point must be a
minimum of 300 mm to the side of the
heater (it must not be above the heater).
Alternatively - unit can be direct wired if
the power supply is to be concealed.
IBF - Slimfire 25
½" BSPF MALE FLARE
79
POWER CORD
RUBBER GROMMET
Consult a qualified electrican if direct
wiring is required. As it must comply
to AS5601.
- 15 -