Flueing; Gas Connection - Rinnai FS 35 Operating And Installation Instructions

Table of Contents

Advertisement

This heater requires a minimum 3m. fl ue.
Position the heater.
Suspend a plumbline from the ceiling to
the centre of the fl ue socket.
Mark the centre of the fl ue in the ceiling.
Make a small hole in the ceiling and double
check that the fl ue system will be at least
25 mm clear of combustible materials.
Cut the hole for the fl ue.
Fit the ceiling plate, fl ue and decorative
cover.
The decorative cover must be able to slide up
to give access to the fl ue spigot. The inner
fl ue must be supported independently of the
heater but allowing suffi cient movement to
allow connections to and disconnections from
the fl ue spigot.
RUN GAS SUPPLY
For pipe sizing, refer to your local gas installation
codes.
Copper supply should be run leaving a fl ared connection
at the position shown.
PURGE SUPPLY OF AIR AND SWARF.
All foreign materials such as fi lings must be purged
from the gas supply, as they may cause the gas valve to
malfunction.
Connect and tighten union.
On completion of work, check for gas leaks.

FLUEING

GAS CONNECTION

7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents