PIAGGIO Beverly Tourer 250 i.e. Service Station Manual page 174

Hide thumbs Also See for Beverly Tourer 250 i.e.:
Table of Contents

Advertisement

Injection
Check the presence of fixed voltage between the
grey/black cable of the remote control base and
earth. If there is none check the continuity of the
grey/black cable between the fuse box (No. 4 10
A) and the remote control base.
N.B.
CONTINUITY TESTS MUST BE CARRIED OUT WITH THE
COMPONENTS DISCONNECTED. (REMOTE CONTROLS,
CONTROL UNIT, FUSES ETC.).
After switching to «ON», check that there is battery
voltage, for about 2 seconds, between the Black-
Green cable of the pump connector and the
ground lead with the pump connector disconnec-
ted. Otherwise, check the continuity of the Black-
Green cable between the pump connector and the
remote control base.
Check the efficiency of the earth line of the fuel
pump by measuring the continuity between the
pump connector black cable, system side, and the
earth.
If, when switching to «ON», the pump continues to
turn after 2 seconds of activation, check, with the
control unit disconnected and the injection load re-
mote control disconnected, that the Black-Purple
cable (pin 20 on the interface wiring) is insulated
from the ground.
Specific tooling
020331Y Digital multimeter
Circuit leak test
Install the specific tool for checking the fuel pressure, with the pipe fitted with the gauge.
INJEC - 174
Beverly Tourer 250 i.e.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents