Positioning The Fire-Box; Installing The Heat-Retaining Blocks; Top Flue Connection To Steel Chimney - Contura C 460 Installation Instruction

Table of Contents

Advertisement

GB
9

Positioning the fire-box

Position the fire-box on the template so that the front legs are
centred over the markings.
Fit the fan (optional accessory) in accordance with the
Installation Instructions for Fan 2000/C460.

Installing the heat-retaining blocks

Place the seven olivine blocks on the ledge as shown.
LEK

Top flue connection to steel chimney

Follow the instructions on page 7 when making a hole through
the ceiling. Slide the flue base over the collar. Make sure that
the seal round the collar is not dislodged. If further sealing
material is required, heat-resistant sealant may be used.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents