SMA SUNNY ISLAND 4548-US Operating Manual page 59

Off-grid inverter
Hide thumbs Also See for SUNNY ISLAND 4548-US:
Table of Contents

Advertisement

SMA Solar Technology America LLC
4. Connect the insulated conductors to the supplied three-pole terminal. The pins have the
following meaning:
– NC: normally closed (when the Sunny Island is
off, the relay is closed)
– C: Contact (front contact)
– NO: normally opened (when the Sunny Island
is off, the relay is open)
5. Tighten the terminals (torque: 5 in-lb to 7 in-lb
(0.56 Nm to 0.79 Nm)).
6. Insert the three-pole terminal into corresponding pin connector on the Sunny Island.
Power Contactor for Load Shedding
The Sunny Island can automatically disconnect loads to protect the battery from deep discharge. An
external (AC or DC) power contactor must be installed between the Sunny Island and the loads (see
Section 12.1 "Load Shedding", page 103).
Installing the power supply of a DC power contactor for load shedding (e.g. relay2):
Power supply of the DC power contactor
A voltage of 48 V supplied by the battery is present in the control circuit.
• Load the BatVtgOut terminals with a maximum of 0.75 A.
1. Connect the A1 coil terminal of the power contactor to the terminal NO (Relay2).
2. Wire terminal C (Relay2) to the terminal "BatVtgOut +".
3. Wire the A2 coil connector of the power contactor to the terminal "BatVtgOut –".
☑ The control circuit of the power contactor is installed.
Operating Manual
6  Electrical Connection
SI4548-6048-US-BE-en-21
59

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Sunny island 6048-usSunny island 4548-us-10

Table of Contents