SMA Solar Technology America LLC
Position
Description
B
LEDs showing device operation
C
Control buttons
D
Slot for the SD memory card
E
Opening for the additional connections area (insertion of the cables via conduits)
F
Connection area for additional connections
G
Opening for the additional connections area (insertion of the cables via conduits)
H
Rubber enclosure opening for the area of additional connections (inserting cables
without conduits)
I
DC connection area
K
Opening for the DC connection area (insertion of DC+, DC − and the grounding
conductor)
L
Opening for AC2 terminal (insertion of the conductors L, N and grounding
conductor)
M
AC connection area
N
Opening for AC1 terminal (insertion of the conductors L, N and grounding
conductor)
O
DC circuit breaker

2.3 Scope of Delivery

Check that the delivery is complete. Check the packaging and the Sunny Island for externally visible
damage.
Contact your supplier in case of damage to the packaging. Please contact your distributor if you find
any damage to the Sunny Island or if the delivery is incomplete.
Keeping the packaging
Keep the packaging in case you need to return the inverter or its accessories.
Operating Manual
2  Sunny Island 4548-US / 6048-US
SI4548-6048-US-BE-en-21
23

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Sunny island 6048-usSunny island 4548-us-10

Table of Contents