SMA SUNNY ISLAND 4548-US Operating Manual page 119

Off-grid inverter
Hide thumbs Also See for SUNNY ISLAND 4548-US:
Table of Contents

Advertisement

SMA Solar Technology America LLC
14  Connecting External Sources
Sunny Island Connected in Parallel to a 120 V Generator
Sunny Island in the Split-Phase System connected to a 240 V Generator
Generally, the internal transfer relays of the slaves close only if the internal relay of the master is
closed.
Plants with master and slave unit on one battery (cluster operation) will keep on working if one slave
fails. If the master fails, the whole cluster stops its operation.
Operating Manual
SI4548-6048-US-BE-en-21
119

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Sunny island 6048-usSunny island 4548-us-10

Table of Contents