For Multicluster system operation, the entire main cluster is always required. If a device in the main
cluster fails (master and/or slave), this causes the main cluster to stop.
If the main cluster is stopped — whether due to a fault, or otherwise — this causes the extension clusters
to stop, and thus the entire Multicluster system.
For operation of an extension cluster, it is necessary that at least the master device (of the extension
cluster) is in operation. If a slave device in the extension cluster fails, this does not cause the master
device to stop.
The devices in an extension cluster are only started up if the respective device detects a voltage when
starting.

16.10 Grid Operation

The multicluster system is not certified for grid-tie use.

16.11 Generator Emergency Operation

If a Multicluster system fails, manual operation via the generator is possible. For this purpose, the
generator must be started manually, directly at the generator. As soon as a voltage is present, the
Multicluster Box connects the generator through to the loads, without a Sunny Island being in
operation.
Operating Manual
SI4548-6048-US-BE-en-21
149

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Sunny island 6048-usSunny island 4548-us-10

Table of Contents