Turn Power On - Daikin ERSQ 011AAV1 Service Manual

Table of Contents

Advertisement

ESIE09-08

1.1.2 Turn Power On

Turn outdoor unit p ower on .
Turn indoor unit p ower on .
Carry out field setting, if
necessary
Car ry out the test run as
desc ribed in the installation
manual of the indoor unit
Test Operation
Be sure to turn the power on 6 hours before starting operation to
protect compressors.
Close outside panels of the outdoor unit.
Wait until initialization period is over (up to 12 min).
(Can be known by checking leds on outdoor PCB - see "Field
Settings from Outdoor unit" for details.
Test Operation
(V3056)
73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents