PRIMARY SHEAVE AND DRIVE V-BELT
Å
: 1st
120 Nm (12.0 m · kg, 85 ft · lb)
2nd 60 Nm (6.0 m · kg, 43 ft · lb)
Order
Job name/Part name
Primary sheave removal
1
V-belt
2
Blind cap
Primary sheave assembly
3
PRIMARY SHEAVE AND DRIVE V-BELT
POWER TRAIN
Q'ty
1
1
1
4-1
Remarks
Remove the parts in the order listed below.
For installation, reverse the removal procedure.
POWR
TR
SEA4010