STARTER MOTOR
10. Install a new felt washer (Figure 10-39, (1)) to
the armature.
Figure 10-39
Figure 10-39
11. Align the projection of the field coil frame with
the cutout in the magnetic switch
(Figure 10-40).
Figure 10-40
Figure 10-40
12. Assemble the field coil frame and armature
assembly using two through bolts
(Figure 10-41, (1)) and torque to 95 kgf·cm,
9.32 N·m (82.4 lb-in.).
10-16
Figure 10-41
(1)
13. Connect the lead wire to terminal 50
(Figure 10-42, (1)) using a screw and washer
and torque to 41 kgf·cm, 4.02 N·m (35.5 lb-in.).
0005427
Figure 10-42
14. Connect the lead wire to terminal C
(Figure 10-43, (1)) and install the nut and
0005428
torque to 215 kgf·cm, 21.08 N·m (186.5 lb-in.).
© 2007 Yanmar Marine International
Figure 10-41
( 1 )
Figure 10-42
6LPA Service Manual
Starter
( 1 )
0005429
0005430

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

6lpa-stzp2

Table of Contents