Expansion cards and battery backup units
6.3.3
Replacing expansion cards
Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
Note on network settings recovery
I
When replacing network controllers or the system board, network
configuration settings in the operating system will be lost and replaced
by default values. This applies to all static IP address and LAN teaming
configurations.
Ensure to note down your current network settings before replacing a
controller or the system board.
6.3.3.1
Required tools
Preliminary and concluding steps: tool-less
●
Main steps:
●
– Phillips PH2 / (+) No. 2 screw driver
6.3.3.2
Preliminary steps
Perform the following procedures:
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 45
Ê
Ê Remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 46
Ê
"Removing the mezzanine card bracket" on page 47
Ê
card) or
"Removing the mezzanine card" on page 119
card)
110
Upgrade and Maintenance Manual
(without the mezzanine
(with the mezzanine
CX250 S2