"Disabling SVOM boot watchdog functionality" on page 65
Ê
Ê Locate the desired server with the ID button.
"Shutting down the server node" on page 45
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 46
Ê
9.2.2.3
Removing the UFM board
Figure 127: Removing the UFM board (A)
Ê Remove the nylon screw on the defective UFM board (1).
Ê Disconnect and remove the defective UFM board (2).
CX250 S2
Upgrade and Maintenance Manual
System board and components
219