Figure 71: Cable routing with onboard controller (B)
Ê Make sure that the cable will not be damaged here (on both sides).
6.5.2.6

Concluding steps

Perform the following procedures:
"Installing the server node in the server enclosure" on page 63
Ê
"Switching on the server node" on page 64
Ê
Ê Enable and configure the onboard RAID controller.