Installing The System Board; Swapping The Processor - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

9.3.3.2

Installing the system board

Figure 131: Installing the system board
Ê Hold the new system board by the memory module ejectors.
V
CAUTION!
– Do not lift or handle the system board by any of its heat sinks!
– Ensure not to damage the EMI springs to comply with applicable
EMC regulations and satisfy cooling requirements and fire
protection measures.
Ê At a slight angle, lower the system board into the chassis (1).
Ê Carefully shift the system board in the direction of the arrow until the plug
shells engage with the cut-outs in the connector panel (2).
Ê Lower the system board down.
Ê Secure the system board with ten screws (see circles).
9.3.3.3

Swapping the processor

V
CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
CX250 S2
Upgrade and Maintenance Manual
System board and components
227

Advertisement

Table of Contents
loading

Table of Contents