Removing Memory Modules; Required Tools; Preliminary Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

7.3

Removing memory modules

Upgrade and Repair Units (URU)
Average task duration: 5 minutes
7.3.1

Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less
7.3.2

Preliminary steps

Perform the following procedures:
"Disabling SVOM boot watchdog functionality" on page 65
Ê
Ê Locate the desired server node.
"Shutting down the server node" on page 45
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 46
Ê
Ê Disconnect the SATA cable(s) from the connectors on the system board
described in section
and take it out of the chassis.
Ê If a BBU is installed disconnect the BBU cable from the BBU connector on
the mezzanine SAS RAID controller described in section
boards" on page
"Removing the memory slot air ducts" on page 60
Ê
Ê Identify the desired memory slot according to the mounting order described
in section
"Memory sequence" on page
CX250 S2
"Connectors on the boards" on page
251,
figure 152
and take it out of the chassis.
Upgrade and Maintenance Manual
"Connectors on the
172.
Main memory
251,
figure 150
179

Advertisement

Table of Contents
loading

Table of Contents