Removing expansion cards
Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
6.3.2.1
Required tools
Preliminary and concluding steps: tool-less
●
Main steps:
●
– Phillips PH2 / (+) No. 2 screw driver
6.3.2.2
Preliminary steps
Perform the following procedures:
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 45