Removing Expansion Cards; Required Tools; Preliminary Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

Expansion cards and battery backup units
"Enabling boot watchdog functionality" on page 74
Ê
"After replacing / upgrading LAN controllers" on page 82
Ê
6.3.2

Removing expansion cards

Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
6.3.2.1

Required tools

Preliminary and concluding steps: tool-less
Main steps:
– Phillips PH2 / (+) No. 2 screw driver
6.3.2.2

Preliminary steps

Perform the following procedures:
Ê Locate the desired server node with the ID button.
"Shutting down the server node" on page 45
Ê
Ê Remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 46
Ê
"Removing the mezzanine card bracket" on page 47
Ê
card) or
"Removing the mezzanine card" on page 119
card)
106
Upgrade and Maintenance Manual
(if applicable)
(without the mezzanine
(with the mezzanine
CX250 S2

Advertisement

Table of Contents
loading

Table of Contents