Installing The Mezzanine Card; Required Tools; Preliminary Steps - Fujitsu PRIMERGY CX250 S2 Upgrade And Maintenance Manual

Server node
Hide thumbs Also See for PRIMERGY CX250 S2:
Table of Contents

Advertisement

Expansion cards and battery backup units
6.4.1

Installing the mezzanine card

Upgrade and Repair Units (URU)
Average hardware task duration: 5 minutes
Average software task duration: 5 minutes
6.4.1.1

Required tools

Preliminary and concluding steps: tool-less
Main steps:
– Phillips PH2 / (+) No. 2 screw driver
6.4.1.2

Preliminary steps

Perform the following procedures:
"Disabling SVOM boot watchdog functionality" on page 65
Ê
"Shutting down the server node" on page 45
Ê
"Removing the server node from the server enclosure" on page 46
Ê
"Removing the mezzanine card bracket" on page 47
Ê
"Installing the linking board" on page 54
Ê