Average task duration: 5 minutes
Average software task duration: 5 minutes
7.4.1

Required tools

Preliminary and concluding steps: tool-less
Main steps: tool-less
7.4.2

Preliminary steps

Perform the following procedures:
"Disabling SVOM boot watchdog functionality" on page 65
Ê
Ê Locate the desired server node.
"Shutting down the server node" on page 45
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 46
Ê
Ê Disconnect the SATA cable(s) from the connectors on the system board
described in section
and take it out of the chassis.
Ê If a BBU is installed disconnect the BBU cable from the BBU connector on
the mezzanine SAS RAID controller described in section
boards" on page
"Removing the memory slot air ducts" on page 60
Ê
182
"Connectors on the boards" on page
251,
figure 152