Figure 3.4 Installing The Processor Board; Figure 3.5 Installing The Processor Board - Samsung OfficeServ 7200 Technical Manual

Hide thumbs Also See for OfficeServ 7200:
Table of Contents

Advertisement

OfficeServ 7200
TECHNICAL MANUAL
2) Align the MCP/MP20 board to the guardrails of slot 0 of the main cabinet, and slide the
MCP/MP20 board into the slot.
3) Push the front panel lever until the board is completely inserted into the OfficeServ 7200
slot 0.
4) The above steps 2~3 also apply to installing the LCP board to slot 0 of the expansion
cabinet.

Figure 3.4 Installing the Processor Board (1)

Figure 3.5 Installing the Processor Board (2)

3.7
Table of Contents
Home Page
INSTALLATION
PART 3 MAY 2010

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents