Vertical Termination Requirements - Quadra-Fire SAPH-MBK-IPI Installation Manual

Hide thumbs Also See for SAPH-MBK-IPI:
Table of Contents

Advertisement

E. Vertical Termination Requirements
Install Metal Roof Flashing
• See minimum vent heights for various pitched roofs (Figure
7.11) to determine the length of pipe to extend through the
roof.
• Slide the roof flashing over the pipe sections extending
through the roof as shown in Figure 7.12.
2 FT.
20 INCHES MIN.
MIN.
GAS DIRECT VENT
TERMINATION CAP
Roof Pitch
Flat to 6/12............................................... 1.0*
over 6/12 to 7/12 ................................... 1.25*
over 7/12 to 8/12 ..................................... 1.5*
over 8/12 to 9/12 ..................................... 2.0*
over 9/12 to 10/12 ................................... 2.5*
over 10/12 to 11/12 .................................3.25
over 11/12 to 12/12 ...................................4.0
over 12/12 to 14/12 ...................................5.0
over 14/12 to 16/12 ...................................6.0
over 16/12 to 18/12 ...................................7.0
over 18/12 to 20/12 ...................................7.5
over 20/12 to 21/12 ...................................8.0
* 3 foot minimum in snow regions
Figure 7.11 Minimum Height From Roof To Lowest Discharge Opening
NOTICE: Failure to properly caulk the roof flashing and pipe
seams may permit entry of water.
• Caulk the gap between the roof flashing and the outside
diameter of the pipe.
• Caulk the perimeter of the flashing where it contacts the
roof surface. See Figure 7.15.
• Caulk the overlap seam of any exposed pipe sections that
are located above the roof line.
40
Quadra-Fire • SAPH-MBK-IPI, SAPH-D-PMH-IPI, SAPH-D-MBK-IPI, SAPH-D-CSB-IPI Installation Manual • 2343-980_R8 • 11/14
HORIZONTAL
OVERHANG
VERTICAL
WALL
LOWEST
DISCHARGE
OPENING
X
12
ROOF PITCH
IS X/ 12
H (MIN.) - MINIMUM HEIGHT FROM ROOF
TO LOWEST DISCHARGE OPENING
H (Min.) Ft.
Figure 7.12
• any occupied areas above the first floor, including closets
and storage spaces, which the vertical vent passes through
must be enclosed. See Figure 7.13 for required clearances
between vent and enclosure.
WARNING! Risk of Fire! Maintain air space clearance to
vent. DO NOT pack insulation or other combustibles around
vent system. Failure to keep insulation or other material
away from vent pipe may cause overheating and fire.
Ceiling Firestop
Minimum 1 in.
(25mm) Clearance
Minimum 1 in.
(25mm) Clearance
Figure 7.13
CAULK
Nails
Minimum 1 in.
(25mm) Clearance
Minimum 1 in.
(25mm) Clearance

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents