Quadra-Fire TOPAZ-MBK-IPI Installation Manual

Quadra-Fire TOPAZ-MBK-IPI Installation Manual

Hide thumbs Also See for TOPAZ-MBK-IPI:
Table of Contents

Advertisement

INSTALLER: Leave this manual with party responsible for use and operation.
OWNER: Retain this manual for future reference.
NOTICE: DO NOT discard this manual!
Models:
TOPAZ-MBK-IPI
TOPAZD-PMH-IPI
TOPAZD-MBK-IPI
TOPAZD-CSB-IPI
Solitaire
This appliance may be installed as an OEM installation
in manufactured home (USA only) or mobile home and
must be installed in accordance with the manufacturer's
instructions and the manufactured home construction
and safety standard, Title 24 CFR, Part 3280 or Standard
for Installation in Mobile Homes, CAN/CSA Z240MH, in
Canada.
This appliance is only for use with the type(s) of gas
indicated on the rating plate.
1
Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15
Installation Manual
Installation and Appliance Setup
R
Cabinet Style
WARNING: If the information in these
instructions is not followed exactly, a fire or
explosion may result causing property damage,
personal injury, or death.
- DO NOT store or use gasoline or other flammable
vapors and liquids in the vicinity of this or any other
appliance.
- What to do if you smell gas
• DO NOT try to light any appliance.
• DO NOT touch any electrical switch; do not use any
phone in your building.
• Immediately call your gas supplier from a neighbor's
phone. Follow the gas supplier's instructions.
• If you cannot reach your gas supplier, call the fire
department.
- Installation and service must be performed by a qualified
installer, service agency, or the gas supplier.
DANGER
!
HOT GLASS WILL CAUSE
BURNS.
DO NOT TOUCH GLASS
UNTIL COOLED.
NEVER ALLOW CHILDREN
TO TOUCH GLASS.
A barrier designed to reduce the risk of burns
from the hot viewing glass is provided with
this appliance and shall be installed for the
protection of the children and other at-risk
individuals.
In the Commonwealth of Massachusetts installation must be
performed by a licensed plumber or gas fitter.
See Table of Contents for location of additional Commonwealth
of Massachusetts requirements.

Advertisement

Table of Contents
loading

Summary of Contents for Quadra-Fire TOPAZ-MBK-IPI

  • Page 1 In the Commonwealth of Massachusetts installation must be performed by a licensed plumber or gas fitter. See Table of Contents for location of additional Commonwealth of Massachusetts requirements. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 2: Table Of Contents

    A. Top to Rear Vent Conversion ..... . 32 B. Securing and Leveling the Appliance ....35 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 3: Installation Standard Work Checklist

    Comments: Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective action needed _____________________________________________________________________________________ _________________________________________________________________________________________________ _________________________________________________________________________________________________ Comments Communicated to party responsible ____________________ by ______________________on ___________ (Builder / Gen. Contractor/) (Installer) (Date)  = Contains updated information. 2341-982 6/14 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 4: Product Specific And Important Safety Information

    • A 110-120 VAC circuit for this product must be protected with ground-fault circuit-interrupter protection, in compliance with the applicable electrical codes, when it is installed in locations such as in bathrooms or near sinks. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 5: Requirements For The Commonwealth Of Massachusetts

    The sign shall read, in print size no less than one-half (1/2) in. in size, “GAS VENT DIRECTLY Connection section additional BELOW. KEEP CLEAR OF ALL OBSTRUCTIONS”. Commonwealth of Massachusetts requirements. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 6: Getting Started

    Non-corrosive leak check solution 1/2 - 3/4 in. length, #6 or #8 Self-drilling screws Caulking material (300ºF minimum continuous exposure rating) One 1/4 in. female connection (for optional fan). Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 7: Framing And Clearances

    23-1/8 29-1/2 27-3/4 22-7/8 NOTE: Diagrams show gas appliance equipped without optional Blower, Part #GFK-160A. Installation of optional blower does not affect overall dimensions. Figure 3.1 Appliance Dimensions Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 8: Clearances To Combustibles

    *B and *C Dimensions. Model Top of Side of (MAX.) pipe pipe TOPAZ-MBK-IPI 6-1/2 66-1/4 36-3/4 Inches TOPAZD-PMH-IPI TOPAZD-MBK-IPI 1683 1016 Millimeters TOPAZD-CSB-IPI Figure 3.2 Appliance Locations Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 9: Termination Location And Vent Information

    Over 16/12 to 18/12 ..........7.0 Over 18/12 to 20/12 ..........7.5 Over 20/12 to 21/12 ..........8.0 * 3 foot minimum in snow regions Figure 4.1 Minimum Height From Roof To Lowest Discharge Opening Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 10: Chimney Diagram

    • Vinyl protection kits are suggested for use with vinyl siding. Figure 4.3 Minimum Clearances for Termination Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 11: Approved Pipe

    • Roof flashing and a storm collar are required when venting passes through the roof. • Follow instructions provided with the venting for installation of these items. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 12: Use Of Elbows

    (flange of termination cap) (see Figure 4.3). • Vertical terminations are measured to bottom of termination cap. • Horizontal pipe installed level with 1/4 inch rise per foot. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 13: Venting Guidelines For Horizontal Runs

    VERTICAL RISE IS PROHIBITED Installation requirements to replace the first 90º elbow with two 45º elbows: 3 FT. MIN. 4 ft min. (1.22 m) REAR VENT Figure 4.6 Figure 4.7 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 14 8.5 m 8 ft., 10 in. 2.7 m 32 ft. 9.8 m 6 ft., 4in. 2.0 m 36 ft. 11.0 m 3 ft., 10 in. 1.2 m Figure 4.8 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 15 28 ft. 8.5 m 5 ft., 10 in. 32 ft. 9.8 m 3 ft., 4 in. Note: As vertical pipe increases, a flue restrictor may be required. Figure 4.9 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 16 7.3 m 5 ft., 4 in. 28 ft. 8.5 m 2 ft., 10 in. 864 mm Note: As vertical pipe increases, a flue restrictor may be required. Figure 4.10 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 17 Top Vent - Vertical Termination No Elbow = 40 ft. Max. (12.2 m) = 6 ft. Min. (1.8 m) Note: As vertical pipe increases, a flue restrictor may be required. Figure 4.11 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 18 32 ft., 6 in. 9.9 m 5 ft., 10 in. 1.8 m 32 ft. 9.8 m 36 ft., 3 in. 11.0 m 3 ft., 4 in. 1.0 m Figure 4.12 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 19 8.5 m 37 ft., 3 in. 11.4 m 2 ft., 10 in. 864 mm Note: As vertical pipe increases, a flue restrictor may be required. INSTALLED HORIZONTALLY Figure 4.13 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 20 5 ft., 10 in. 1.8 m 14 in. 356 mm 32 ft. 9.8 m 6 in. 152 mm 3 ft., 4 in. 1.0 m 14 in. 356 mm Figure 4.14 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 21 5 ft., 4 in. 1.6 m 28 ft. 8.5 m 6 in. 152 mm 14 in. 356 mm 2 ft., 10 in. 864 mm INSTALLED HORIZONTALLY Figure 4.15 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 22 VENTING STRAIGHT OUT THE REAR WITHOUT VERTICAL RISE IS PROHIBITED Minimum Maximum Minimum Maximum 6 in. 152 mm 14 in. 356 mm 6 ft. 1.8 m 40 ft. 12.2 m Figure 4.16 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 23 14 in. 356 mm 2 ft., 10 in. 864 mm 37 ft., 3 in. 11.4 m CAUTION VENTING STRAIGHT OUT THE REAR WITHOUT VERTICAL RISE IS PROHIBITED Figure 4.17 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 24 7. The connection between the appliance and the retro connector may be completed with sections of direct vent pipe. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 25 4 ft. (1m) of 3 in. (76mm) Flex Liner Air Intake Section Co-Axial to Co-Linear Connector (Included in Chimney Liner (Part 46DVA - GCL) Termination Kit) Figure 4.22 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 26 See Figure 4.24. of flex liner together. Connect the flex to the coupler by using four sheet metal screws for each side. See Figure 4.25. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 27 See Figure 4.27. Redrill larger holes on connector as needed. Be careful to ensure that the connector is centered in the opening and the mounting holes line up with the masonry wall. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 28 • May impair safe operation of this appliance or other appliances connected to the flue. • Vent this appliance directly outside. • Use separate vent system for this appliance. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 29: Vent Clearances And Framing

    Top: 2-1/2 in. (64 mm) Bottom: 1/2 in. (13 mm) Sides: 1 in. (25 mm) Figure 5.1 Horizontal Venting Clearances To Combustible Materials Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 30: Pipe Clearances To Combustibles

    FROM FLOOR Inches 59-3/4 71-1/8 59-3/4 71-1/8 1518 1807 1518 1807 *As dimensions “E” and “F” change, dimensions “A” and “B” must change accordingly. Figure 5.2 Wall Penetration Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 31: Ceiling Firestop/Floor Penetration Framing

    INSTALL ATTIC INSULATION SHIELDS BEFORE OR AFTER INSTALLATION OF VENT SYSTEM CEILING FIRESTOP CEILING FIRESTOP INSTALLED BELOW CEILING INSTALLED ABOVE CEILING Figure 5.4 Installing the Attic Shield Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 32: Appliance Preparation

    See Figure 6.2. Save the screws. (If gasket breaks, apply high-temp sealant to bottom of collar before installing as shown in Figure 6.8.) REMOVE KNOCKOUT Figure 6.4 Figure 6.2 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 33 Remove the two screws that hold the burner to the rear firebox wall. See Figure 6.12. Remove burner from appliance. Figure 6.7 Remove Screws Under Rear Access Plate Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 34 WARNING Explosion Risk • Pilot must be reattached to burner. • Delayed ignition or an explosion may occur if the pilot is not attached to the burner shield. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 35: Securing And Leveling The Appliance

    Normally, only one is required on the leg not touching the floor. Figure 6.2 2. Slide assembled nuts and bolts into slots on legs with the nuts on the bottom. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 36: Venting And Chimneys

    Use care when removing termination cap from slip pipe. If slip section seals are broken during removal of the termination cap, vent may leak. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 37: Assemble Slip Sections

    • Only outer pipes are sealed, sealing the inner flue is not required. • All unit collar, pipe, slip section, elbow and cap outer flues shall be sealed. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 38: Secure The Vent Sections

    Figure 7.7 Rotate Seams for Disassembly point to appliance. 120º Figure 7.5 Securing Vertical Pipe Sections Figure 7.8 Align and Disassemble Vent Sections 120º Figure 7.6 Securing Horizontal Pipe Sections Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 39 2 in. (51 mm) MIN. BELOW FINISHED CEILING CUT HOLE 1/8 in. (3 mm) GREATER IN SIZE THAN PATTERN OF SUPPORT BOX AS IT IS PROJECTED ONTO ROOF LINE Figure 7.9 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 40: Vertical Termination Requirements

    • Caulk the perimeter of the flashing where it contacts the Figure 7.13 roof surface. See Figure 7.12. • Caulk the overlap seam of any exposed pipe sections that are located above the roof line. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 41 • Tighten nut and make sure the collar is tight against the Caulk pipe section. • Caulk around the top of the storm collar. See Figure 7.15. Figure 7.15 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 42: Horizontal Termination Requirements

    • Rest the small leg on the extended heat shield on top of the pipe section to properly space it from the pipe section. Important Notice: Heat shields may not be field constructed. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 43 Heat Shield or Heat Extended Heat Shield Shield SLIP SECTION CAN BE EXTENDED Wall Shield Firestop WALL Figure 7.17 Venting through the wall Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 44: Electrical Information

    Verify proper operation after servicing. WARNING! Risk of Shock! Replace damaged wire with type 105º C rated wire. Wire must have high temperature insulation. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 45: Wiring Requirements

    FLAME IGNITER SENSE TO JUNCTION BOX (110V) TO JUNCTION MODULE BOX (110V) FLAME MODULATION RC100 RC200 RC300 (OPTIONAL CONTROLS) BATTERY PACK 6V DC Figure 8.1 IPI Wiring Diagram Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 46 Minimum 14-3 AWG with Ground Black Black White White Green Green Junction Box Power Switch Box Supply Wires Knockout Figure 8.2 Junction Box Wired to Wall Switch or BC10 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 47: Optional Fan Installation

    3. Slide temperature sensor switch/bracket assembly onto the 10-32 screw located on the underside of the appliance. Secure the bracket assembly with the wing nut provided. See Figure 8.4. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 48: Gas Information

    1/2 in. (13 mm) T-handle manual shut-off valve and flexible gas connector are connected to the 1/2 in. (13 mm) control valve inlet. • If substituting for these components, please consult local codes for compliance. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 49: Air Shutter Setting

    • Slide the wing nut to the left to open the air shutter. • Tighten the wing nuts. NOTICE: If sooting occurs, provide more air by opening the air shutter. WING NUTS FOR SHUTTER ADJUSTMENT Figure 9.1 Air Shutter Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 50: Appliance Setup

    C. Clean the Appliance Clean/vacuum any sawdust that may have accumulated TOP CASTING inside the firebox or underneath in the control cavity. FRONT CASTING SAFETY BARRIER Figure 10.1 Remove Casting Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 51: Install The Refractory

    Do not attempt to push the brick flat against the outer wall of the firebox. Panels should rest against the refractory tabs. REFRACTORY TAB Figure 10.8 Refractory Installed Figure 10.5 Place Right Side Refractory Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 52: Install The Log Assembly

    Figure 10.9 Log Bracket Position - Propane LOG BRACKET MOVED FORWARD FOR NG NO GAP Figure 10.10 Log Bracket Position - NG Figure 10.12 Place Log #2 and Log #3 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 53: Mineral Wool

    Do not overtighten. See Figure 10.1 and 10.2 for reference. Reinstall front casting by setting in place and tightening the thumb screw. • Reinstall safety barrier Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 54: Reference Materials

    SLP48 1219 SLP6A 2 - 6 51 - 152 SLP12A 2 - 12 51 - 305 SLP-FLEX-2 SLP-FLEX-3 SLP-FLEX-5 1524 SLP-FLEX-10 3048 Figure 11.1 SLP Series Vent Components Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 55 26 in. 14-7/16 in. 660 mm 367 mm 2-5/16 in. DVP-HSM-B 14-7/16 in. 59 mm Extended Heat Shield 367 mm SLP-WT-BK Wall Thimble-Black Figure 11.2 SLP Series Vent Components Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 56 318 mm 10-3/4 in. 273 mm 14 in. 7-1/2 in. 356 mm 192 mm SLP-TVHW Vertical Termination Cap SLP-FLEX-TRAP Horizontal Termination Kit Figure 11.3 SLP Series Vent Components Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 57 14 IN. 356 mm 12 IN. SLP-TB1 305 mm Horizontal Termination Cap STOVEDV-BK STOVEDV-BK Simpson Duravent Pipe Adapter Collar Pipe Adapter Collar Figure 11.4 SLP Series Vent Components Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 58 A. Vent Components Diagrams (continued) COAXIAL to COLINEAR VENTING DV-46DVA-GCL Coaxial/Colinear Appliance Connector 768-380A LINK-DV30B Stainless Steel Flex Pipe Flex Liner Kit LINKSQC-DV30 (COPPER) LINKSQB-DV30 (BLACK) Figure 11.5 SLP Series Vent Components Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 59 3” x 35’ Flex Extension 3DFA-35 4” x 35’ Flex Extension 4DFA-35 45° Elbow, Galvanized SLP45M 4DE45 45° Elbow, Black SLP45-BK See Swivel 4DE45B 45° Elbow, Swivel, Galvanized 46DVA-E45 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 60 * Stove Adaptor Kit (Vertical Cap Kit) Includes 30’-4” flex, adapters, wall thimble, masonry, ZC flashing, 991DA vertical cap NOTES: BEFORE CUTTING ANY HOLES CHECK PIPE MANUFACTURERS CURRENT INSTRUCTIONS. EACH PIPE MANUFACTURER HAS THEIR OWN LIST OF PARTS FOR KITS. SL IS NOT INTERCHANGEABLE WITH SLP. Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 61 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...
  • Page 62: Accessories

    Please contact your Quadra-Fire dealer with any questions or concerns. For the location of your nearest Quadra-Fire dealer, please visit www. .com. quadrafire Printed in U.S.A. - Copyright 2014 Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15...

This manual is also suitable for:

Topazd-pmh-ipiTopazd-mbk-ipiTopazd-csb-ipi

Table of Contents