Quadra-Fire SAPH-MBK-IPI Installation Manual page 34

Hide thumbs Also See for SAPH-MBK-IPI:
Table of Contents

Advertisement

TOP CASTING
Figure 11. Remove Casting
GLASS LATCHES
Figure 12. Remove Glass Frame
REFRACTORY
TABS
(BOTH SIDES)
BURNER MOUNTING
PILOT
SCREWS
ASSEMBLY
(UNDER REFRACTORY,
BOTH SIDES)
Figure 13. Remove Burner
15. Using the 3/8 in. open end wrench, replace the main burner
orifice with the orifice included in the conversion kit. Use
appropriate orifice for gas type. See Figure 14.
34
Quadra-Fire • SAPH-MBK-IPI, SAPH-D-PMH-IPI, SAPH-D-MBK-IPI, SAPH-D-CSB-IPI Installation Manual • 2343-980_R8 • 11/14
FRONT CASTING
PILOT
ASSEMBLY
Figure 14.
16. Reinstall burner with four screws.
17. on inside of firebox, remove plate and gasket on rear
of firebox by removing three screws as shown in Figure
14. discard gasket. Replace screws on rear of firebox.
Remove three screws as shown in Figure 15. attach plate
and new gasket, included in kit, with three screws.
18. Reinstall upper baffle. ensure the upper portion of the
baffle rests on top of the refractory tabs.
REMOVE THESE SCREwS (3) USE TO ATTACH PLATE
REMOVE THESE SCREwS
(3), REMOVE PLATE,
REPLACE SCREwS
Figure 15.
19. Reinstall the pilot to the burner.
!
explosion Risk
• Pilot must be reattached to burner.
• delayed ignition or an explosion may occur if
the pilot is not attached to the burner shield
20. Reinstall side refractory, if applicable. Reinstall logs.
21. Reinstall the glass frame. Secure the glass frame into
position with the latches located on the bottom sides of
the firebox.
22. Reinstall front casting.
MAIN BURNER ORIFICE
WARNING