Vent Clearances And Framing; Pipe Clearances To Combustibles; Wall Penetration Framing/Firestops - Quadra-Fire SAPH-MBK-IPI Installation Manual

Hide thumbs Also See for SAPH-MBK-IPI:
Table of Contents

Advertisement

5

Vent Clearances and Framing

A. Pipe Clearances to Combustibles
WARNING! Risk of Fire! Maintain air space clearance to
vent. DO NOT pack insulation or other combustibles:
• Between ceiling firestops
• Between wall shield firestops
• Around vent system
Failure to keep insulation or other material away from
vent pipe may cause overheating and fire.
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm).
• If wall thickness is less than 4 in. the existing heat shields must be field trimmed. If
wall thickness is greater than 7-1/4 in. a DVP-HSM-B will be required.
• SLP heat shield - designed to be used on a wall 4-3/8 in. to 7-5/8 in. (111 mm to
194 mm thick).
• If wall thickness is less than 4-3/8 the existing heat shields must be field trimmed.
If wall thickness is greater than 7-5/8 in. a DVP-HSM-B will be required.
3 in. (76 mm)
top clearance
1 in. (25 mm)
clearance around
vertical sections
Heat
Shield
* When using SLP pipe, minimum clearances from the vent pipe to combustible
materials at inside wall firestops are:
Figure 5.1 Horizontal Venting Clearances To Combustible Materials
30
Quadra-Fire • SAPH-MBK-IPI, SAPH-D-PMH-IPI, SAPH-D-MBK-IPI, SAPH-D-CSB-IPI Installation Manual • 2343-980_R8 • 11/14
(SLP Pipe Shown)
Heat
3 in. (76 mm)
Shield
top clearance *
Heat
Shield
1 in. (25 mm)
clearance
Wall
bottom & sides
Shield
Firestop
WALL
3 in. (76 mm)
top clearance *
1 in. (25 mm)
Wall
clearance
Shield
bottom & sides
Firestop
WALL
Top: 2-1/2 in. (64 mm)
Bottom: 1/2 in. (13 mm)
Sides: 1 in. (25 mm)
B. wall Penetration Framing/Firestops
Combustible wall Penetration
Whenever a combustible wall is penetrated, you must
frame a hole for the wall shield firestop(s). the wall shield
firestop maintains minimum clearances and prevents cold
air infiltration.
• the opening must be framed on all four sides using the
same size framing materials as those used in the wall
construction.
• SlP pipe - a wall shield firestop must be placed on each
side of an interior wall. a minimum 1-1/2 in. (38 mm)
overlap of attached heat shields must be maintained.
• See Section 7.F. for information for regarding the
installation of a horizontal termination cap.
Non-Combustible wall Penetration
If the hole being penetrated is surrounded by non-
combustible materials such as concrete, a hole with
diameter one inch greater than the pipe is acceptable.
Whenever a non-combustible wall is penetrated, the wall
shield firestop is only required on one side and no heat
shield is necessary.
10 in.
10 in.
10 in.
10 in.
A*
B*
A*
Inches
45-1/8
mm
1146
508
*dimension is increased by 1/4 inch for every foot of horizontal pipe coming from
the appliance.
**as dimension "e" changes, dimension "a" must change accordingly.
Figure 5.2 wall Penetration
C
D
MEASURED
FROM FLOOR
B*
C
D
20
45-1/8
20
1146
508
E**
E**
12
305

Hide quick links: