Quadra-Fire SAPH-MBK-IPI Installation Manual page 17

Hide thumbs Also See for SAPH-MBK-IPI:
Table of Contents

Advertisement

Top Vent - Vertical Termination
V
= 30 ft. Max. (9.1 m)
1
V
= 6 ft. Min. (1.8 m)
No Elbow
1
V
1
Figure 4.11
17
Quadra-Fire • SAPH-MBK-IPI, SAPH-D-PMH-IPI, SAPH-D-MBK-IPI, SAPH-D-CSB-IPI Installation Manual • 2343-980_R8 • 11/14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents