Boiler Jacket - Top Covers; Rating Tag Plate - Buderus SB735 Series Installation And Maintenance Manual

Condensing gas boiler
Hide thumbs Also See for SB735 Series:
Table of Contents

Advertisement

Boiler Assembly
6.6

Boiler Jacket - Top Covers

Locate the boiler top cover sections Fig. 23 with the
edges facing forward loosely onto the left and right
side walls.
J NOTICE!
Push the boiler top cover sections forward.
The third top cover section provides a cut-out
(Fig. 23, Item. 3) for the low water indicator.
Cover the cut-out with a cover plate.
Boiler
Item
Item
model
1
790
17
17
¾
970
17
17
¾
1200
17
17
¾
Table. 5 Dimensions of boiler top cover sections from Fig. 23,
Item. 1 to 5 (all dimensions in inches)
Align and tightly secure the cross bracket.
Insert the thermal insulation into the lower front wall
(Fig. 24, Item. 1).
Hook the lower front wall with four offset hooks onto
the slots of the side wall edge (Fig. 24).
Hook the offset brackets of the top front wall (Fig. 24,
J NOTICE!
Item. 2) into the slots of the lower front wall edge and
at the top into edge of the front top cover.
If the front wall can only be located with some
difficulties, re-align the central cross bracket.
Hook the upper (Fig. 25, Item. 3) and the lower cover
part (Fig. 25, Item. 2) into the front wall sections
using the hook provided.
Secure the rating tag plate to the side panel (Fig. 25).
6.7

Rating Tag Plate

Affix the rating tag plate (Fig. 25, Item. 1) according
to the boiler location on the left or right side wall.
We reserve the right to make any changes due to technical modifications!
Boiler Installation and Maintenance Manual SB735 • Issue 10/2003
Item
Item
2
3
4
17
11
¾
¾
¼
17
19
¾
¾
½
17
19
¾
¾
½
1
Item
5
11
¼
19
½
19
½
Fig. 23 Top cover sections
2
1
Fig. 24 Front cover panels
3
2
Fig. 25 Inserting front cover panels
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
5
4
3
2
2
hakghah
hakghah
hakg
6
1
19

Advertisement

Table of Contents
loading

Table of Contents