7.3

Installing the side panels and the front boiler jacket

Press insulation panels into the side between the
cast feet.
Insert thermal insulation mats for the right side panel
behind the gas connection pipe.
Fasten the two side panels with two self-tapping
screws at the bottom and one at the back of the boiler
Position the intermediate panel thermal insulation
mats on the top of the front of the boiler with the fabric
side on the outside.
If the two side hooks on the front boiler jacket are not
in position, bend them with pliers and push them into
the slots in the side panel edges from behind.
Fasten the two rear tabs on the front boiler jacket to
the side panels with two self-tapping screws.
We reserve the right to make any changes due to technical modifications.
Installation and maintenance instructions Logano G334 X gas-fired boiler • Issue 09/2005
Fig. 7
Insulation panels
1 Insulation panel
Fig. 8
Side panels and front boiler jacket
1 Rear tab
2 Side hook
3 Side panel screws