9
Check List
Neutralization system
1
Isolate the neutralization system from the main
electricity supply
2
Disconnect the inlet and outlet hose from the
granulate container
3
Remove the container lid of the neutralization
system
4
Remove used granulate (the container can be filled
by 180°), clean out the container
5
Fill with fresh granulate (in accordance with
instructions)
6
Replace and, if necessary, bolt down the container
lid of the neutralization system
7
Plug-in the mains cable of the neutralization system
into a main socket
8
Reconnect all hose connections and check for leaks
9
Start-up the neutralization system
10
Specialist contractor
__________ 01
Date:
Specialist contractor
__________ 05
Date:
We reserve the right to make any changes due to technical modifications!
28
Specialist contractor
___________ 02
Date:
Specialist contractor
___________ 06
Date:
Boiler Installation and Maintenance Manual SB735 • Issue 10/2003
01
02
03
04
Specialist contractor
__________ 03
Date:
Specialist contractor
__________ 07
Date:
Buderus Heiztechnik GmbH • http://www.heiztechnik.buderus.de
05
06
07
08
Specialist contractor
___________ 04
Date:
Specialist contractor
___________ 08
Date:

Advertisement

Table of Contents
loading

Table of Contents