Check off the different maintenance steps, place an „X"
in the corresponding box and list date and service
company name below.
Follow recommended time frame for boiler and burner
maintenance work.
Heating system
1
Disconnect electrical supply to system
2
Shut off gas supply
3
Disconnect gas supply from burner
4
Remove front jacket panels, open burner door
5
Remove reversing door
6
Remove condensate drain hose from neutralization
system
7
Check and clean combustion chamber
8
Check and clean out fire tube passages
9
Flush condensate drain connection at boiler
10
Check and clean flue collector
11
Check burner gasket, replace if necessary
12
Check gasket on reversing door, replace if
necessary
13
Reattach condensate drain hose
14
Close off the reversing cover, bolt down and as-
semble jacket panels
15
Pour 3 gal. of water into the combustion chamber
16
Close the burner door, bolt down and assemble ja-
cket panels
17
Reattach the gasline to the burner
18
Check the gasline for leaks and correct if necessary
19
Check venting system for leaks, repair when needed
20
Check operation of the safety controls
21
Check operation of all operating controls
22
Bring the system back into regular operation
23
We reserve the right to make any changes due to technical modifications!
Boiler Installation and Maintenance Manual SB735 • Issue 10/2003