Installation of Insulation & Boiler Jacket Panels
•
Secure the lower rear panel with the knock-out
for the drain on the bottom with screws to the
side panels (Fig. 34).
•
Snap the bottom of the front panel in the lower
front cover and support it at the top from the
folded edge (Fig. 35).
•
Hang the burner door cover into the knock-outs
of the front panel (Fig. 36).
•
Secure second rating plate to the side panel for
best viewing.
Lower rear panel
Fig. 34
Front panel
Fig. 35
Burner door cover
Fig. 36
9
Screw
Folded edge
Lower front cover
Rating plate
19