Setting Up The Boiler Block; Block) - Buderus Logano G315 Installation And Service Instructions Manual

Low-temperature oil/gas boiler
Table of Contents

Advertisement

Fig. 19 Fitting the tie rods
B The next step describes the installation of the supply
pipe (
Chapter 7.4, page 24).
Logano G315 - Subject to technical modifications
Boiler block assembly
7.3

Setting up the boiler block

(assembled block)
DANGER: Risk of fatal injury from falling
objects.
B Provide a suitable means of supporting
the load.
B Observe all locally applicable occupational
health & safety regulations regarding lifting
equipment.
B Cut the retaining band (Fig. 20, [1]).
B Remove the pallet prior to positioning the boiler block
(Fig. 20, [2]).
Fig. 20 Boiler block on pallet
B Level the boiler block vertically and horizontally on the
base/foundation (
Chapter 6.3, page 17).
The following pages describe the installation of the supply
pipe and sensor well. You must do both irrespective of
whether the boiler is supplied pre-assembled or in
separate sections.
7
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents