13
System inspection and maintenance
Additional maintenance work as-needed
1.
Shut down the heating system
2.
Remove and clean flue gas baffles
3.
Clean the flue gas passages (heating surfaces)
4.
Clean the combustion chamber
5.
Clean the draft diverter
6.
Insert the flue gas baffles
7.
Check gaskets/sealant ropes on the burner and burner
door and replace if required (see burner documentation)
8.
Commissioning the heating system
9.
Record the final checks of the maintenance work, incl.
measurements and test results
10.
Check safe and proper operation
Confirm professional inspection
48
Page
Date:____________
40
42
42
42
43
43
37
Company stamp/
signature
Logano G315 - Subject to technical modifications
Date:____________
Company stamp/
signature