Buderus Logano G315 Installation And Service Instructions Manual page 35

Low-temperature oil/gas boiler
Table of Contents

Advertisement

B Route capillary pipe sensor to the measuring port of
the boiler and then guide the sensor into the sensor
well (Fig. 48, [2]) and secure with the retaining clip
(Fig. 48, [3]).
Fig. 48 Fitting the sensor set
B Screw cable entry (Fig. 49, [1 and 2]) to the left and
right of the rear boiler panel.
A permanent connection must be made in accordance
with EN 50165 or the relevant national installation
standard.
Fig. 49 Making the electrical connections
B Wire up the electrical connections as shown in the
wiring diagram. Take care to ensure correct cable and
capillary tube routing.
Logano G315 - Subject to technical modifications
Installing the control panel
Secure all cables with cable clips.
B Insert cable clips with cable inside into the clip frame
and secure by clamping it with the lever (Fig. 50, [1]).
1
Fig. 50 Fastening the electr. connecting leads
B Hook the lower hook on the rear panel section
(Logamatic 43..) into the clip frame and apply pressure
at the top until the side hooks click into place
(Fig. 47, [2]).
B Screw terminal cover (Fig. 46, [1]) with the two self-
tapping screws back into the control panel base
(Fig. 51).
Fig. 51 Boiler with fitted control panel
9
6 720 642 621-41.1o
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents