Specify How Weeks Split When Spanning A Higher-Level Time Period - IBM Cognos User Manual

Version 10.1.1
Table of Contents

Advertisement

6. In the Level name box, type a name for the parent of the convergence level in
the new drill-down path.
For a fiscal year path connected at the Month level, the parent level name is
Fiscal Quarter.
7. In the Associations box, click Add.
8. In the New Association dialog box, select Source from the Association role
drop-down list, and click More to select the column that contains date values
for the dimension. Click OK twice.
9. Click the Time tab.
10. In the Date function list, select the function to apply to the level and click
OK.
11. To add additional levels to the alternate drill-down path, select the level you
just added and follow steps 5 through 10 for each new level.
12. Open the Categories diagram for the time dimension.
13. Open the property sheet for the drill category of the alternate drill-down path
and click the Time tab.
14. In the Year begins box, type the date on which the fiscal year starts and click
OK.
For example, if the current fiscal year started on April 1 of 2006, type
20060401.
Specify How Weeks Split When Spanning a Higher-level Time
Period
In a time dimension that includes weeks, you can choose from three options to
handle weeks that span a higher-level time period.
To specify how weeks split, choose from the following options:
v Always split the spanning week into two separate weeks, each of which includes
the days that occur in the higher-level time period.
Each part of the split week appears in the Categories diagram as a separate
week. For example, the week beginning Sunday, December 31, 2006 and ending
Saturday, January 6, 2007 appears as two weeks: 20061231 (a child of December)
and 20070101 (a child of January). Always Split is the default setting.
v Split the spanning week into two distinct weeks, but not if a 1-day week is
created as a result. Select the Split > 1 day setting.
For example, Sunday, December 31, 2006 appears in the same week as 20070101.
v Place the spanning week in a specific time period: First Period, Last Period, or
Largest Period.
Procedure
1. Open the Categories diagram for the time dimension.
2. Open the Drill Category property sheet.
If the dimension contains multiple drill-down paths, open the Drill Category
property sheet for the drill-down path you want to change.
3. Click the Time tab.
4. From the Partial weeks box, select the week-spanning rule to apply and click
OK.
Chapter 4. Structuring Your Data Into Dimensions
75

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents