Front-Mounting A Switch In A Two-Post Rack - Extreme Networks Summit X150 Series Hardware Installation Manual

Summit x150/x250e/x350/x440/x450/x450a/x450e/x460/x480/x650/x670 series
Hide thumbs Also See for Summit X150 Series:
Table of Contents

Advertisement

Chapter 6: Installing Summit Family Switches
6 Secure the mounting bracket flanges to the rack, using screws that are appropriate for the rack.
(Rack-mounting screws are not provided.)
The Summit X460 series switch is shipped without installed power supplies. You can install one or two
power supplies. After the switch is secured to the rack, install the necessary power supplies for your
configuration. For instructions, see the following pages:
300 W AC power
supply—page 224
750 W AC power
supply—page 226
300 W DC power
supply—page 229
To install an XGM3-2sf port card, see
To install a stacking module, see

Front-Mounting a Switch in a Two-Post Rack

To front-mount a Summit X460 series switch in a two-post rack:
1 Attach an ESD-preventive wrist strap to your bare wrist and connect the metal end to an appropriate
ground point on the rack.
2 Attach each mounting bracket as follows:
a Set the bracket against the switch housing, with the flange even with the front panel of the switch
(see
Figure
165).
b Use six of the provided screws to secure the bracket to the switch housing.
c Repeat steps
a
and
Figure 165: Attaching a Rack-mounting Flange
3 Slide the switch into the equipment rack
222
page
309.
page
311.
b
to attach the other bracket to the other side of the switch.
(Figure
SH_199
166).
Summit Family Switches Hardware Installation Guide

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents