Table 7-1. Mx2820 Shelf Installation Checklist; Acceptance Test Checklist - ADTRAN MX2820 System Manual

Adtran mx2820 multiplexer: system manual
Hide thumbs Also See for MX2820:
Table of Contents

Advertisement

ACCEPTANCE TEST CHECKLIST

MX2820 Shelf Installation in a Central Office Checklist
Table 7-1
provides the checklist. Write N/A by any step which does not apply to the installed
configuration.
Test Step
1. Verify fan operation.
2. Verify Alarm Relay output con-
nection.
3. Verify inter-shelf communica-
tion.
4. Verify IP LAN connection.
Comments
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
Installation Engineer Sign-off
Name (print): _________________________ Date Completed: ___________________________
Customer Sign-off
Name (print): _________________________ Date Completed: ___________________________
61186003L1-1D
Section 7, User Interface Guide - DLP-601, MX2820 Acceptance Test Procedure

Table 7-1. MX2820 Shelf Installation Checklist

Completed (Initial)
Signature: _________________________________
Signature: _________________________________
7-43

Advertisement

Table of Contents
loading

Table of Contents