MX2820 System Manual
At this point in the initial NTP for the MX2820 system, power
should be applied to the shelf.
PROCEDURE
Perform the Steps Below in the Order Listed:
1. Install Modules in MX2820 Shelf:
• Unpack, inspect, and install the primary Clock Module.
• Unpack, inspect, and install the protect Clock Module, if required.
• Install front panel blanks in vacant slots.
2. Connect the primary and secondary clock source to the shelf (if not com-
pleted as part of NTP-001).
3. Provision the Clock interface
4. Provision Clock Module Protection
FOLLOW-UP PROCEDURES
SCU and Clock Card are now installed for the STS-1 application. Proceed with "NTP-004,
1 MUX
Installation". Follow-up procedures should be observed in accordance with CO SOP.
6-10
NOTE
For details, refer to:
DLP-505
DLP-506
DLP-743
DLP-744
STS-
61186003L1-1D