MX2820 System Manual
PROCEDURE
Perform the Steps Below in the Order Listed:
1. Install Modules in MX2820 Shelf:
• Unpack, inspect, and install the primary MUX Module.
• Unpack, inspect, and install the protect MUX Module, if required.
• Install front panel blanks in vacant slots.
2. Provision the STS-1 network.
3. Provision the VT/Port (T1/E1) interface.
4. Provision STS-1 MUX protection.
5. Provision STS-1 MUX loopback timeout.
6. Perform acceptance testing for STS-1 MUX Modules.
FOLLOW-UP PROCEDURES
All applicable modules, SCU and the required STS-1 MUX modules, have been installed.
Follow-up procedures should be observed in accordance with CO SOP.
6-12
For details, refer to:
DLP-505
DLP-741
DLP-742
DLP-738
DLP-739
DLP-602
61186003L1-1D