Installing The Carrier Frames To The Cutting Units - Toro Reelmaster 3105-D Operator's Manual

Traction unit
Hide thumbs Also See for Reelmaster 3105-D:
Table of Contents

Advertisement

7.
Torque the swivel fittings of the return and lift
hoses to 37 to 45 N∙m (27 to 33 ft-lb).
Figure 14
1. Straight swivel fitting
(return hose)
8.
Clean hydraulic fluid from the machine.
6
Installing the Carrier
Frames to the Cutting Units
Parts needed for this procedure:
3
Cutting Unit (optional part—order separately)
Preparing the Cutting Units
1.
Remove the cutting units from the cartons.
2.
Adjust the cutting units as instructed in the
Operator's Manual for the cutting units.
Assembling the Carrier Frames for
the Front Cutting Units
Cutting Unit with Links
Note:
The front carrier frames are part of the optional
lift arm kit.
1.
Align the holes in the plates of the front-carrier
frame with the holes in the cutting unit mounting
plates
(Figure
15).
g346476
2. 90° swivel fitting (lift hose)
1. Pivot tube (front-carrier
frame)
2. Carriage bolt (3/8 x 2-1/4
inches)
3. Plate (front carrier frame)
2.
Align a washer between the carrier plate and
link
(Figure
15), and loosely assemble the plates
and spacer with a carriage bolt (3/8 x 2-1/4
inches), washer, and flange locknut (3/8 inch).
Note:
If you are starting assembly at the back of
the cutting unit, use the middle hole of the plate.
3.
Repeat step
2
4.
Torque the flange locknuts to 37 to 45 N∙m (27
to 33 ft-lb).
5.
Repeat steps
cutting unit and carrier frame.
Assembling the Cutting Unit and
Rear Carrier Frame
Cutting Unit with Links
Note:
The rear carrier frame is part of the optional
lift arm kit.
1.
Align the hole in the plates rear-carrier frame
with the hole in the cutting unit mounting plates
17
Figure 15
4. Washer
5. Link (cutting unit)
6. Flange locknut (3/8 inch)
at the other plate holes and links.
1
through
4
for the other front
g353162

Advertisement

Table of Contents
loading

This manual is also suitable for:

03174

Table of Contents