4. Insert the lift arms onto the lift arm pivot shafts
(Figure 12), and secure each with a lift arm pivot
shaft link and bolts previously removed.
Note: Torque the bolts to 70 ft-lb (95 N-m).
Figure 12
1. Lift arm, right
2. Lift arm, left
3. Retaining ring
5. Remove the rear retaining rings securing the
mounting pins to each end of the lift cylinder.
6. Secure the right end of the lift cylinder to the right
lift arm with a pin and 2 spacers (Figure 13). Secure
it with a retaining ring.
Figure 13
1. Lift cylinder
2. Hoses
7. Secure the left end of the lift cylinder to the left lift
arm with a pin. Secure it with a retaining ring.
Note: With the lift arms fully raised, the hoses should
be routed as shown in Figure 13 and clear the lift arm by
0.04 to 0.12 inch (1 to 3 mm).
4. Mounting pin
5. Lift cylinder
6. Spacers (2)
3. Clearance here
9
Installing the Carrier Frames
to the Cutting Units
No Parts Required
Procedure
1. Remove the cutting units from the cartons. Adjust
them as described in the Cutting Unit Operator's
Manual.
2. Position a front carrier frame (Figure 14) onto each
front cutting unit. Align the mounting holes with the
mounting links as shown in Figure 16.
1. Front carrier frame
3. Position the rear carrier frame (Figure 15) onto the
rear cutting unit, and align the mounting holes with
the mounting links as shown in Figure 16.
18
Figure 14