START UP AND OPERATION

See the merchandiser's Technical Data Sheet for refrigerant settings and defrost require ments. Bring merchandisers down to the operating
temperatures listed on the data sheet. Merchandiser(s) must operate for 24 hours before loading products.
Monitor case temperature regularly to ensure it is at the proper level. Monitor the unit for any unusual noises or vibrations and address them
promptly to prevent further problems. Check the electrical connections and wiring for any issues.
Excessive ambient conditions may cause condensation and therefore sweating of doors. Facility operators should monitor doors and floor
conditions to ensure safety of persons.

12 HOURS AFTER START UP CHECKLIST

Check case temperature.
Check water connections for leaks or accumulation of water.
Verify the fans are running.
Check compressor's amperage, and validate with the information on serial plate.
Check the door operation again to ensure doors open and close properly once the case is down to operating temperature.
Check that all inspection plates and covers have been properly replaced.
Inspect for any water accumulation due to incorrect or unsealed penetrations where electrical or other lines pass through insulated walls of the case.
Verify that the lights are "ON". (lights are switched remotely.) If lights are "OFF", check the illumination schedule and circuit breaker for the lights.
Check the water outlet temperature from each condensing unit. Water outlet temperature should be less than 10° above water inlet temperature.