Commissioning

Cleaning case

Remove the PVC protective coating on stainless steel, where applicable
Remove any residue, silicon or tape marks with a cloth moistened with rubbing alcohol
Remove all debris from in and around the case
Wipe case with a clean, damp cloth, if necessary

Starting up

Check supply power is ready and correct voltage. (by Licensed Person)
Confirm correct operation of RCD (if fitted) (by Licensed Person)
Turn case power on
Start up checks – by qualified persons only
Ensure that the drain trap is installed the right way up (refer to figure 7: drain trap orientation in the section
installing the waste drain)
Check that all fans and lights (and light RCDs, if installed) are working correctly.
Check the anti sweat circuit, ensuring the thermostat is set correctly.
Set expansion valves and EPRs as per Product Engineering Data – Available from Hussmann.
Approximately 24 hours after start-up, check that the case is at correct operating temperature (refer the Product
Engineering Data).
________________________________________________________________________________________________________________________
Page 18
MJPE multideck and SMD/SME Low Height Multideck
Hussmann

Advertisement

Table of Contents
loading

Table of Contents