2-6. Installing the reactor box [Only for the EU type models]
* For the EU-type models, install the reactor box that is supplied with the sewing machine.
❷
❷
Brown
❻
❸
❶
❸
❹
Blue
❺
– 6 –
1) Detach reactor cover ❷ from reactor box ❶ to
separate from reactor base asm. ❸ .
* The reactor cover can be detached with ease
by inserting a tool that has a thin flat tip such
as a flat-blade screwdriver between the cover
and base.
2) Take out screw bag ❹ from cover ❷ .
* The screw bag contains two different kinds of
screws (four pieces each).
3) Slide reactor ❺ in the direction of the arrow to
insert into reactor base asm. ❸ .
1. When inserting the reactor, detach
bundled wire clamp ❻ beforehand.
2. Insert reactor
asm. while facing brown and blue
lead wires side upward.
❺
into the reactor base